Sketch and describe a total flooding CO₂ system for machinery spaces, state which valve to operate first and why, and state the periodic maintenance required?
Short answer
flowchart TD
A[CO₂ Cylinder Bank] -->|CO₂| B[Cylinder Head Valve]
B --> C{Bursting Disc 177-193 bar}
C -->|CO₂| D[Non-Return Valve]
D --> E[Sector Valve]
E --> F[Distribution Chest]
F --> G[Quick-Opening Valve]
G --> H[Nozzle]
I[Pilot Cylinder x2] -->|Pilot Gas| J[Release Box]
J -->|Pilot| E
K[Control Panel] -->|Electrical| J
K -->|Interlock| E
- System components: CO₂ storage cylinders (BS ISO 3500:2005), cylinder head valve with bursting disc (177–193 bar), non-return valves, sector valve, distribution chest, pilot cylinders, nozzles
- CO₂ quantity: Sufficient for largest protected space per SOLAS II-2/10 and FSS Code Chapter 5
- First valve: Sector (stop) valve between storage and manifold to isolate system and engage control cabinet interlock
- Maintenance – cylinders: Inspect/test per MGN 374 and BS EN 1968-2002, retest before twice interval, check bursting discs and discharge valves
- Maintenance – piping/valves: Test non-return valves, operate quick-opening valves, check sector valve and interlock, inspect for leaks/corrosion
- Maintenance – controls: Test pilot cylinders, release box, alarms, electrical interlocks
- Records: Log all maintenance in PMS per ISM Code section 10
- ETO checks: Verify electrical components, interlocks, alarms, manual overrides, record tests