MEO Class I · Oral · asked at MMD Kochi

Your ship's hull is breached. What will be your actions as Chief Engineer?

Updated · AI-generated answer

Short answer

  • First: at sea, the engineering watch notifies the Chief Engineer without delay in any emergency, and the bridge of any impending machinery action affecting speed or power (STCW A-VIII/2, paragraphs 77.3, 76)
  • Boundaries: on cargo ships, watertight doors used at sea are remotely closable from the bridge; access doors normally closed at sea show open/closed (SOLAS II-1/13-1.2, 13-1.3)
  • Pumping: ships constructed on or after 1 January 2009: cargo ships at least two power bilge pumps (II-1/35-1.4); passenger ships also a direct suction from the main circulating pump (3.7.1)
  • Stability information: on part B-1 ships, lets the Master assess survivability (II-1/19.4); damage control plan shows list correction (19.1)
  • Power: emergency generator if the main plant is lost to flooding
  • Pollution: SOPEP actions where the plan is carried (MARPOL I/37.1); accidental discharge in Oil Record Book Part I (17.3)
  • Report: company (ISM 9.1); Administration or RO at the earliest opportunity (SOLAS I/11(c)); India: sections 117(1), 138(1), 160; section 231 notice within twenty-four hours
  • In practice, as Chief Engineer: close, pump, keep power and propulsion, transfers only on the Master’s order, record
flowchart TD
  A["Compartment below waterline open to the sea"] --> B["It gives no buoyancy"]
  B --> C["Ship sinks, trims and heels; displacement and G unchanged"]
  B --> D["Part of waterplane lost: BM and GM reduced"]
  C --> E["Subdivision limits the flooded length"]
  D --> E

Explained in detail: STCW Code section A-VIII/2 (watchkeeping)

Rules mentioned: SOLAS · MARPOL · STCW

Full answer

The full answer explains each point step by step, with the regulations and figures behind it and the discussion from other candidates. It is in the MEO Class I section of the Marine One forum, open to members enrolled for the MEO Class I exam.