When taking over a ship, how will you implement the Maritime Labour Convention (MLC)?
Updated · AI-generated answer
Short answer
- Interim certificate: not exceeding six months; no second interim (A5.1.3.6, A5.1.3.8)
- Full certificate: up to five years; if only one intermediate inspection on a five-year certificate, between the second and third anniversary dates (A5.1.3.2)
- Declaration: Part I by the competent authority; Part II by the shipowner, measures for ongoing compliance (A5.1.3.10)
- Hours of rest: not less than ten hours in 24 and 77 in seven days; no more than two periods, one at least six hours; interval not over 14 hours (A2.3)
- Complaints (India): written to the Head of Department; three days, then master seven days; official logbook (rule 26)
- Inspection: intervals not more than three years; ship may be stopped for a serious breach (A5.1.4)
- India: Merchant Shipping Act 2025 s.93(2); Maritime Labour Rules 2026 rules 10, 24, 26
flowchart TD
A{"Ship new to the shipowner?"} -->|Yes| B["Interim certificate after verification"]
B --> C["Full inspection before expiry"]
C --> D["Full certificate with declaration"]
A -->|No| D
D --> E["Engine department applies Part II measures"]
E --> F["Flag inspection of the measures"]
Explained in detail: STCW Code section A-VIII/1 (fitness for duty) · MLC 2006 Standard A5.1.3 (maritime labour certificate)
Rules mentioned: Maritime Labour Convention
Full answer
The full answer explains each point step by step, with the regulations and figures behind it and the discussion from other candidates. It is in the MEO Class I section of the Marine One forum, open to members enrolled for the MEO Class I exam.