As Chief Engineer, what do you check in dry dock?
Updated · AI-generated answer
Short answer
- Context: Dry dock removes the ship from water to enable full underwater hull and appendage survey and maintenance
- Primary checks: Hull plating, welds, coatings; rudder, propeller, sea inlets; stern tube and tailshaft bearing wear; sea chests and gratings; sacrificial anodes
- Blocking: Ship placed on blocks of sufficient strength and distribution per IACS UR Z3 §Z3.2.1
- Survey regime: Classification underwater survey; IWS may substitute if conditions met
- Records: Docking report, coating records, wear measurements, anode consumption, survey reports
- CE accountability: Signs docking report, ensures class attendance, verifies all items before undocking
flowchart TD
A["Land on blocks
UR Z3 §Z3.2.1"] --> B["Visual hull & appendages"]
B --> C["Measure wear: rudder bearings
stern bush"]
B --> D["Check shell plating
sea chests & gratings"]
B --> E["Renew coating & anodes"]
C --> F["Survey report
class attendance"]
F --> G["CE signs docking report
before undocking"]
Explained in detail: Periodical survey of the ship's bottom (in-water survey)
How this answer is built
The rules and references the full answer draws on, from international rules down to practice on board.
The full answer draws on3 sources in 1 group
- Engineering practiceHow it is done on board
- Hull & Underwater Survey (Dry Dock / IWS)
- Z3 §Z3.2.1 — When a ship is in drydock or on a slipway, it is to be placed on blocks of suffi
- Z3 §Z3.3.6 — If the In-water Survey reveals damage or deterioration that requires early atten
Full answer
The full answer explains each point step by step, with the regulations and figures behind it and the discussion from other candidates. It is in the MEO Class I section of the Marine One forum, open to members enrolled for the MEO Class I exam.