What are the types of machinery survey onboard and which items like boiler survey are not covered under Continuous Survey of Machinery?
Updated · AI-generated answer
Short answer
- CSM principle: maintenance and condition monitoring records accepted in lieu of strip-down for survey
- Confirmatory survey: periodic examination of CSM records; surveyor may request test run or insist on strip-down
- Boiler survey: conducted by classification society surveyors on classed vessels
- Not under CSM: boiler survey requires physical examination and testing, not covered by CSM records alone
- Governing instruments: MSIS23 Part B Chapter 11 §11.3.1.1, MSIS23 Annex 3 §8.3.1, MSIS23 Chapter 24 §24.1.2, Merchant Shipping Act 2025
- Chief Engineer: implements CSM for eligible items, prepares records, ensures non-CSM items are physically surveyed
| Survey type | Basis | Who conducts | Physical opening |
|---|---|---|---|
| Continuous Survey of Machinery (CSM) | Maintenance/condition monitoring records | Class society (records review) | Not required unless surveyor insists |
| Confirmatory survey | Examination of CSM records | Class society surveyor | May request test run or strip-down |
| Boiler survey | Physical examination and testing | Classification society surveyor | Required |