Why should machinery breakdown records be readily accessible to the Chief Engineer?

Updated · AI-generated answer

Short answer

  • Scope: IACS UR Z20 applies only to a class-approved planned maintenance scheme replacing Continuous Machinery Survey (1.1.1); owner may cancel it (2.3.7)
  • Owner: under that scheme the chief engineer is in charge, signs overhaul records, controls access (IACS UR Z20, 1.3.1 to 1.3.3)
  • Class: written details of breakdown or malfunction made available at the annual audit (IACS UR Z20, 3.2.5); damaged parts retained where possible (3.2.6)
  • Risk: poor records, poor condition or exceeded overhaul intervals can cancel the arrangement (IACS UR Z20, 2.3.5)
  • ISM: non-conformity reported with possible cause, corrective action, records (ISM Code 10.2.2 to 10.2.4); critical equipment (ISM Code 10.3)
  • Reporting: defect affecting safety to the Administration or recognized organization (SOLAS I/11(c)); India section 160
flowchart LR
    A["Breakdown"] --> B["Chief Engineer notified"]
    B --> C["Repair and cause recorded"]
    C --> D["Planned maintenance logbook"]
    D --> E["Company and class reports"]
    E --> F["Annual audit review"]

Explained in detail: ISM Code §9 (non-conformities and accidents) · SOLAS regulation XI-1/1 (recognized organizations)

Rules mentioned: SOLAS · ISM Code

Full answer

The full answer explains each point step by step, with the regulations and figures behind it and the discussion from other candidates. It is in the MEO Class I section of the Marine One forum, open to members enrolled for the MEO Class I exam.