What it requires

Section 9 of the ISM Code is the reporting and corrective-action loop of the safety management system (SMS). It has two parts.

  • Reporting and analysis (9.1). The SMS must contain procedures that make sure three kinds of event are reported to the Company:

    • non-conformities;
    • accidents;
    • hazardous situations (near-misses).

    Each report is then investigated and analysed. The stated aim is to improve safety and pollution prevention, not to find someone to blame.

  • Corrective action (9.2). The Company must have procedures for carrying out corrective action. These include measures meant to stop the same event happening again.

A footnote to 9.2 points to the IMO (International Maritime Organization) guidance on near-miss reporting, MSC-MEPC.7/Circ.7.

The Code defines the key terms in section 1.1:

  • A non-conformity is an observed situation where objective evidence shows that a specified requirement has not been met.
  • A major non-conformity is an identifiable deviation that poses a serious threat to people or the ship, or a serious risk to the environment, and needs immediate corrective action. It also covers a lack of effective and systematic implementation of a Code requirement.
  • Objective evidence is information, records or statements of fact, based on observation, measurement or test, that can be verified.

Section 9 does not stand alone. Section 1.4.4 lists "procedures for reporting accidents and non-conformities" as one of the six functional requirements of every SMS. Section 10.2 repeats the same loop for maintenance: non-conformities are reported with their possible cause, corrective action is taken, and records are kept. Section 12 closes the loop through internal audits and review.

Why it is asked

Examiners ask about section 9 because it is the part of the ISM Code an auditor tests most directly. Every audit looks for reports, investigations, corrective actions and the records that prove them.

It appears in Class 1 papers and orals in several forms:

  • Scenario questions. An oily water separator fails before port with no spare for a month. A crack is found on a propeller blade in dry dock. A fire breaks out during welding in dry dock. The examiner wants to see the Chief Engineer report to the Company, investigate, take corrective action and record it.
  • Audit questions. The difference between a company (office) audit and a shipboard audit, and how non-conformities raised at audit are closed out.
  • Record-keeping questions. Why filing, follow-up and verification matter, and how an accident or incident investigation relies on records.
  • Management questions. How a Chief Engineer runs the engine department as part of an organisation, including how conflicts and cultural differences affect reporting.

The examiner is looking for the full loop: report, investigate, analyse, correct, prevent recurrence, record, verify.

Regulations and key figures

Instrument Locus What it requires
ISM Code 9.1 SMS procedures so that non-conformities, accidents and hazardous situations are reported to the Company, investigated and analysed to improve safety and pollution prevention
ISM Code 9.2 Company procedures for corrective action, including measures to prevent recurrence
MSC-MEPC.7/Circ.7 Footnote to ISM Code 9.2 IMO guidance on near-miss reporting
ISM Code 1.1.7, 1.1.9, 1.1.10 Definitions of objective evidence, non-conformity and major non-conformity
ISM Code 1.4.4 Procedures for reporting accidents and non-conformities are a functional requirement of every SMS
ISM Code 4 Designated person(s) ashore, with direct access to the highest level of management, monitor safety and pollution-prevention aspects of each ship
ISM Code 5.1.5 The master periodically reviews the SMS and reports its deficiencies to shore management
ISM Code 10.2.2 to 10.2.4 In maintenance, any non-conformity is reported with its possible cause, corrective action is taken and records are kept
ISM Code 12.1 Internal safety audits on board and ashore at intervals not exceeding twelve months; in exceptional cases this may be exceeded by not more than three months
ISM Code 12.6, 12.7 Audit and review results go to the personnel responsible for the area; management takes timely corrective action
ISM Code 13.8, 13.9 At least one intermediate verification of the Safety Management Certificate; if only one in a five-year certificate, between the second and third anniversary dates; the certificate is withdrawn if this is not requested or if there is evidence of a major non-conformity
Merchant Shipping Act 2025 section 147 Every vessel, company or port is surveyed, audited and certified for compliance with the Safety Convention and the other listed conventions, as applicable
Merchant Shipping Act 2025 section 117(1) The master reports a safety or security incident to the authority and in the manner prescribed

On board

Chief Engineer (Class 1)

  • Makes sure every non-conformity, accident and near-miss in the engine department is reported through the company's SMS procedure.
  • Leads or takes part in the investigation of engine-room events. Looks for the root cause, not only the immediate fault.
  • Proposes corrective action and measures to prevent recurrence, and agrees them with the master and the Company.
  • Keeps the records that serve as objective evidence: reports, investigation findings, corrective-action follow-up and close-out.
  • Supports the master's periodic review of the SMS (section 5.1.5) by reporting where procedures do not work in practice.
  • For a defect such as a failed oily water separator or a cracked propeller blade, reports it to the Company with its possible cause, as section 10.2.2 requires. Keeps the Company informed until the corrective action is complete.

Second Engineer (Class 2)

  • Reports defects and non-conformities found during maintenance, with the possible cause where known.
  • Carries out the corrective work assigned in the planned maintenance system and records it.
  • Gathers facts for engine-room investigations: logs, alarm records, statements and photographs.
  • Encourages junior engineers and ratings to report near-misses.

Engineer Officer of the Watch (Class 4)

  • Reports any accident, near-miss or hazardous situation seen during the watch, without delay.
  • Records the facts in the engine-room log at the time they happen.
  • Follows the corrective measures and changed procedures that come out of investigations.

Electro-Technical Officer (ETO)

  • Reports electrical and control-system faults, alarm failures and near-misses in the same way.
  • Provides alarm and event records that help an investigation find the cause.

India. The Merchant Shipping Act 2025 requires every vessel and company to be surveyed, audited and certified for compliance with the Safety Convention, of which the ISM Code is part (section 147). The Act defines the company as the owner or other organisation that has taken over the duties and responsibilities of the International Safety Management Code. The master must report safety and security incidents to the prescribed authority (section 117).

Related topics

  • ISM Code: definitions and functional requirements of the SMS (section 1)
  • ISM Code: designated person ashore (section 4)
  • ISM Code: master's responsibility and authority (section 5)
  • ISM Code: emergency preparedness (section 8)
  • ISM Code: maintenance of the ship and equipment (section 10)
  • ISM Code: company verification, review and evaluation (section 12)
  • ISM Code: certification, Document of Compliance and Safety Management Certificate (sections 13 and 14)
  • Near-miss reporting
  • Accident investigation and root-cause analysis
  • Port State control and detention for ISM-related deficiencies

Traps and follow-ups

Common mistakes

  • Saying section 9 is only about accidents. It covers non-conformities and hazardous situations (near-misses) as well.
  • Stopping at "report to the Company". The section also requires investigation, analysis and corrective action that prevents recurrence.
  • Treating corrective action as a repair. Fixing the broken part corrects the defect; preventing recurrence means changing the cause, such as a procedure, training or maintenance interval.
  • Confusing a non-conformity with a major non-conformity. A major one is a serious threat to people, ship or environment needing immediate action, or a lack of effective and systematic implementation of the Code.
  • Quoting the internal audit interval wrongly. It is at intervals not exceeding twelve months, which may be exceeded by not more than three months only in exceptional circumstances.

Next questions an examiner asks

  • What is the difference between a non-conformity, a major non-conformity and an observation?
  • How is a near-miss different from an accident, and why report it?
  • Who is the designated person ashore, and what is his role in reporting?
  • How do you close out a non-conformity raised at audit, and what evidence do you keep?
  • What happens to the Safety Management Certificate if there is evidence of a major non-conformity?
  • Your oily water separator has failed and the spare is a month away. Walk through your reporting and corrective action as Chief Engineer.

Short forms on this page: CLC: Civil Liability Convention.