Which International Safety Management (ISM) documents are maintained exclusively by the Chief Engineer?
Updated · AI-generated answer
Short answer
- Trap: the ISM Code names no document as the Chief Engineer’s; the company defines responsibilities (ISM Code 3.2)
- Maintenance (class-approved scheme replacing Continuous Machinery Survey only): in charge; signs overhaul records; controls access (IACS UR Z20, 1.1.1, 1.3.1 to 1.3.3)
- Records: inspections, non-conformities with cause, corrective action (ISM Code 10.2.1 to 10.2.4); stand-by tests (ISM Code 10.3)
- Standing orders: read by every relieving engineer (STCW Code A-VIII/2, paragraph 58.1)
- Breakdowns: under an approved scheme, written details available to class (IACS UR Z20, 3.2.5)
- Shared: Oil Record Book Part I signed per operation and each page by the master (MARPOL Annex I, regulation 17.4)
- Control: valid copies, approved changes, obsolete removed (ISM Code 11.2.1 to 11.2.3)
flowchart LR
A["Company defines responsibilities"] --> B["System allocates engine records"]
B --> C["Chief Engineer keeps and signs"]
C --> D["Changes approved, obsolete removed"]
D --> E["Master reviews the system"]
Explained in detail: ISM Code §9 (non-conformities and accidents) · STCW Code section A-VIII/2 (watchkeeping)
Rules mentioned: MARPOL · STCW · ISM Code
Full answer
The full answer explains each point step by step, with the regulations and figures behind it and the discussion from other candidates. It is in the MEO Class I section of the Marine One forum, open to members enrolled for the MEO Class I exam.