MEO Class I · Oral

Can a ship sail with a major non-conformity (MNC) raised by a third party?

Updated · AI-generated answer

Short answer

  • Answer: not as a major non-conformity; one raised on a ship should be downgraded before she sails (MSC/Circ.1059, annex 1)
  • Downgrade terms: schedule not exceeding three months for the corrective actions (MSC/Circ.1059, annex 1)
  • Not downgraded: ISM 13.9; no Interim SMC; new SMC only after an initial-scope verification, same expiry date (annex 8)
  • India: immediate corrective action; no certificate issued or renewed until completed (r.13(6)), unless the cause is beyond the company’s control and rectification is within an agreed period not exceeding three months (r.9(4)); SMC may be declared invalid on evidence of a major non-conformity (r.14(3)(e))
  • Port State: does not audit; detainable ISM deficiency needs an audit by the Administration or RO before release (A.1206(34))
  • Chief Engineer: remove the threat at once, give evidence and a dated plan, sail only after the downgrade
flowchart TD
  A["Major non-conformity raised at ISM audit"] --> B{"Auditor satisfied effective corrective action is being taken?"}
  B -->|Yes| C["Downgraded to non-conformity; plan agreed; ship may sail"]
  C --> D["Additional audit verifies the actions"]
  B -->|No| E["SMC withdrawn; ship does not operate until reissued"]

Explained in detail: ISM Code §9 (non-conformities and accidents)

Full answer

The full answer explains each point step by step, with the regulations and figures behind it and the discussion from other candidates. It is in the MEO Class I section of the Marine One forum, open to members enrolled for the MEO Class I exam.