As Chief Engineer, how do you close a major non-conformity and a non-conformity, for example an MNC raised because a generator is leaking heavily and engine-room procedures are not followed?

Updated · AI-generated answer

Short answer

  • NC closed: corrective action with measures to prevent recurrence (ISM Code 9.2); guidance: not normally more than three months (A.1188(33))
  • MNC: India: immediate corrective action, verified by the auditor; no certificate issued or renewed until it is completed (rule 13(6))
  • Downgrade: if the Administration or recognized organization is satisfied effective corrective action is being taken; before the ship sails; additional audit (MSC/Circ.1059-MEPC/Circ.401)
  • India proviso: SMC may still be issued pending rectification only for reasons beyond the company’s control, within an agreed period not exceeding three months (rule 9(4))
  • Scenario: maintenance (ISM Code 10.1 to 10.4) and procedures (7) not implemented; oil kept off hot surfaces (SOLAS II-2)
  • Trap: repairing the leak alone does not close the finding
flowchart TD
    A["Generator leak and ignored procedures found"] --> B["Generator made safe; leak repaired and tested"]
    B --> C["Causal factors and root causes found"]
    C --> D["Bring planned maintenance up to date; review procedures; retrain and brief the department"]
    D --> E["Objective evidence sent to the company"]
    E --> F{"Closure verified?"}
    F -->|Yes| G["Finding closed; records retained"]
    F -->|No| C

Explained in detail: ISM Code §9 (non-conformities and accidents) · SOLAS regulation XI-1/1 (recognized organizations)

Rules mentioned: SOLAS · ISM Code

Full answer

The full answer explains each point step by step, with the regulations and figures behind it and the discussion from other candidates. It is in the MEO Class I section of the Marine One forum, open to members enrolled for the MEO Class I exam.