What is the survey and certification process under the Hong Kong Convention?

Short answer

flowchart LR
  A["Initial survey: IHM Part I verified"] --> B["ICIHM (regulation 11), up to five years"]
  B --> C["Renewal and additional surveys"]
  C --> D["Final survey: complete IHM, Ship Recycling Plan (regulation 9), authorised facility (DASR, regulation 16)"]
  D --> E["IRRC, up to three months"]
  E --> F["Recycling"]
  • Convention: adopted 15 May 2009, in force 26 June 2025; two chains: the ship’s IHM and certificates, the facility’s plan and authorisation.
  • IHM (regulation 5): Part I structure and equipment, maintained through life; Parts II wastes and III stores before recycling; verified by the Administration or its RO.
  • Surveys (regulation 10): initial, renewal not exceeding five years, additional after a change or repair, and the final survey before recycling (complete IHM, Ship Recycling Plan, authorised facility).
  • Certificates: the ICIHM (regulation 11), not more than five years; the International Ready for Recycling Certificate (IRRC) after the final survey, not more than three months, tied to the plan and facility.
  • Facility side: a ship-specific Ship Recycling Plan (regulation 9) and the Document of Authorization to Conduct Ship Recycling (DASR, regulation 16, with a site inspection); IRRC and DASR both needed.
  • As Chief Engineer: IHM Part I kept true as machinery-space items change; India: Recycling of Ships Act 2019, DGMA as competent authority.

Full answer

The full answer explains each point step by step, with the regulations and figures behind it and the discussion from other candidates. It is in the MEO Class I section of the Marine One forum, open to members enrolled for the MEO Class I exam.