MEO Class I · Written

Discuss the differences between Enhanced Survey Program and Condition Assessment Program Survey?

Short answer

Dimension ENHANCED SURVEY PROGRAMME (ESP) CONDITION ASSESSMENT SCHEME (CAS)
Treaty basis SOLAS regulation XI-1/2; 2011 ESP Code (resolution A.1049(27)) MARPOL Annex I regulation 13G; resolution MEPC.94(46)
Purpose HOW periodical hull surveys are conducted WHETHER a phase-out-liable tanker may continue trading
Ships covered BULK CARRIERS and OIL TANKERS CATEGORY 1 and CATEGORY 2 OIL TANKERS
Trigger Every renewal, intermediate and annual survey Request for continued service beyond 2005 (Cat 1) or 2010 (Cat 2) anniversary
Scope Hull structure per Annex, hold/tank by hold/tank Hull structure IN WAY OF CARGO TANKS, PUMP ROOMS, COFFERDAMS, PIPE TUNNELS, VOID SPACES, BALLAST TANKS
Timing Ordinary survey cycle ALIGNED TO ESP intermediate/renewal survey
Surveyors Administration or RO NOT LESS THAN TWO QUALIFIED EXCLUSIVE RO SURVEYORS with ESP experience
Acceptance criteria Code’s close-up survey, thickness measurement, tank testing RESOLUTION A.744(18) AS AMENDED
Output Survey report file, CONDITION EVALUATION REPORT, certificates CAS FINAL REPORT, STATEMENT OF COMPLIANCE (IOPP supplement)
  • Trap: ESP is a CONTINUING SOLAS survey method; CAS is a ONE-OFF MARPOL Annex I gate for phase-out tankers.
  • ESP covers BULK CARRIERS and OIL TANKERS; CAS covers CATEGORY 1 and 2 OIL TANKERS only.
  • CAS uses ESP criteria (A.744(18)) and runs CONCURRENTLY with ESP surveys.
  • CAS requires TWO EXCLUSIVE RO SURVEYORS + independent RO/Administration review.
  • Failure: ESP = survey not completed; CAS = REMAIN OUT OF SERVICE until valid Statement of Compliance.

Full answer

The full answer explains each point step by step, with the regulations and figures behind it and the discussion from other candidates. It is in the MEO Class I section of the Marine One forum, open to members enrolled for the MEO Class I exam.