With reference to starting air receivers, explain why they should be drained frequently and describe the procedure for inspecting their internal surfaces, indicating possible defects?
Short answer
flowchart TD
A[Start: Isolate receiver] --> B[Depressurize & drain completely]
B --> C[Open manhole/inspection door]
C --> D[Internal visual inspection]
D --> E{Defects found?}
E -->|Yes| F[Record: corrosion, pitting, cracks, scale, oil residue]
E -->|No| G[Check relief valves & fusible plugs]
F --> G
G --> H[Test drain lines clear]
H --> I[Close up, pressure test if required]
I --> J[Log in maintenance records]
- Drain reason: condensate and oil carry-over creates fire/explosion risk in the air system
- Drain frequency: regularly; cooler drains open automatically on stop and timed cycle while running
- Access: inner surfaces must be examinable and cleanable; manhole large enough for entry where practicable
- Protection: efficient drains, relief valves, fusible plugs required
- Inspection scope: internal examination for corrosion and pitting; relief valves overhauled and tested; all valves opened for inspection; drain lines proven clear
- Possible defects: corrosion, pitting, cracks, scale, oil residue, moisture accumulation
- Test alternative: if too small for entry, hydraulic test at 1.5 × max working pressure
- Stamping: test authority, test pressure, working pressure, date, surveyor’s initials over access hole
- As EOOW: verify drains clear, log inspection, report defects to Chief Engineer, ensure relief/fusible devices functional