As Chief Engineer, how will you prepare your ship for a Safety Management Certificate (SMC) audit under the International Safety Management (ISM) Code?
Updated · AI-generated answer
Short answer
- Basis: ISM Code mandatory (SOLAS IX/3.1); SMC after verifying the company and ship operate to the approved SMS (IX/4.3)
- Audits: SMC not exceeding five years; at least one intermediate, between second and third anniversary if only one on a five-year SMC (ISM 13.8); renewal may be done within three months before expiry; additional on clear grounds
- Evidence: documents, interviews, observation; all records open, incl. statutory and class (A.1188(33) 4.12.3, 3.3.2)
- Grades: observation, non-conformity, major non-conformity (ISM 1.1.8-1.1.10)
- Prepare: controlled documents (ISM 11); maintenance, critical equipment, stand-by tests and records (ISM 10); internal audit within twelve months (ISM 12.1)
- Open findings: corrective action normally within three months; an Indian SMC is not issued, endorsed or renewed until major non-conformities are rectified and verified, unless rectification is beyond the company’s control and agreed within three months (r.9(4))
- Company duties: familiarise staff, appoint staff to assist the auditor, provide documents, access and evidence, cooperate (r.16(2))
flowchart LR A["Last internal audit findings closed"] --> B["Documents and records in order"] B --> C["Machinery spaces checked against records"] C --> D["Engineers briefed"] D --> E["Opening meeting, interviews, closing meeting"] E --> F["Corrective action through the company"]
Explained in detail: ISM Code §9 (non-conformities and accidents) · ISM Code §12 (audits and reviews)
Rules mentioned: SOLAS · ISM Code
Full answer
The full answer explains each point step by step, with the regulations and figures behind it and the discussion from other candidates. It is in the MEO Class I section of the Marine One forum, open to members enrolled for the MEO Class I exam.